Edit To-Do Item
This document is no longer available beyond version 22. Information can now be found using the following links:
The features available depend on your Altium product access level. Compare features included in the various levels of Altium Designer Software Subscription and functionality delivered through applications provided by the Altium 365 platform.
If you don’t see a discussed feature in your software, contact Altium Sales to find out more.
The Edit To-Do Item dialog
Summary Copy Link Copied
The Edit To-Do Item dialog is used to add or edit a to-do item.
Access Copy Link Copied
This dialog is accessed in the following ways:
- Right-click within a *.txt file, then selecting Add To-Do Item.
- Right-click in the To-Do panel, then select Add Project To-Do Item
Options/Controls Copy Link Copied
- Text - enter the text of the to-do item.
- Word Wrap - check to automatically word wrap the text.
- Priority - use the drop-down to assign a priority for the to-do item. Select from the following: Normal (default), Lowest, Low, High, Highest.
- Owner - use the drop-down to select the owner of the to-do item or enter a name in the text box.
- Category - use the drop-down to enter a category for the to-do item or enter a category in the textbox.
- Done - check to signify the to-do item has been completed.