Placement - Permitted Layers

Now reading version 16.0. For the latest, read: Placement - Permitted Layers for version 21
 

Rule category: Placement

Rule classification: Unary

Summary

This rule specifies which layers components can be placed on, during placement with the Cluster Placer.

Constraints

Default constraints for the Permitted Layers rule.

  • Permitted Layers– the layers permitted to be used by the Cluster Placer during autoplacement. The following layer options are available:
    • Top Layer – allow component placement on the top layer.
    • Bottom Layer – allow component placement on the bottom layer.

How Duplicate Rule Contentions are Resolved

All rules are resolved by the priority setting. The system goes through the rules from highest to lowest priority and picks the first one whose scope expression matches the object(s) being checked.

Rule Application

During autoplacement with the Cluster Placer.

Tips

  1. The Cluster Placer does not change the layer a component is on – you must set the component layer prior to running the placer.

 

If you find an issue, select the text/image and pressCtrl + Enterto send us your feedback.
Note

The features available depend on your Altium product access level. Compare features included in the various levels of Altium Designer Software Subscription and functionality delivered through applications provided by the Altium 365 platform.

If you don’t see a discussed feature in your software, contact Altium Sales to find out more.

Content