Managed OutputJob Options for a Project in Altium NEXUS
Created: 10月 31, 2018 | Updated: 10月 31, 2018
| Applies to versions: 2.0 and 2.1
現在、バージョン 2.1. をご覧頂いています。最新情報については、バージョン Managed OutputJob Options for a Project in Altium NEXUS の 4 をご覧ください。
Summary
This tab of the Project Options dialog allows you to add or remove managed output jobs from a server.
Access
This is one of multiple tabs available when configuring the options for a project accessed from within the Project Options dialog. To access this dialog:
- Click Project » Project Options in the Schematic or PCB Editor.
- Right-click on the Project entry on the Projects panel then click Project Options from the context menu.
Options/Controls
- Outputjob List - lists all the managed outputjobs in terms of: Item Revision, Revision State, Description, and Name.
- Add - click to open the Select configuration item (Output Jobs) dialog to select the desired outputjob(s).
- Remove - click to remove the selected output job(s).
- Set To Installation Defaults - click to return to default settings.