VersionControl_Dlg-CommitFormCommit to Version Control_ADR

This document is no longer available beyond version 22.0. Information can now be found here: Commit Changes for version 25

 

The Commit to Version Control dialog
The Commit to Version Control dialog

Summary

 The Commit to Version Control dialog allows the designer to commit project files to VCS.

Access

In the Projects panel, right-click on a file that is not version controlled and select Version Control » Commit Whole Project.

Options/Controls

Upper Pane

 This upper pane lists all files in the selected project and lists whether or not they are in VCS. Additional relevent information is also listed, including whether a file is marked for addition or deletion. The designer can select files to commit to version control. The Path column shows the path of each file, the Status column shows the file's current status. This part of the dialog also features a small right-click menu with the following options:

  • Select All - Click to select all files listed in the dialog. Selected files will be added to VCS.
  • Select None - Click to deselect all files listed in the dialog. These files will not be added to VCS.
  • Select Project Documents - Click to select only project documents. Only the selected files will be added to VCS.

Lower Pane

  • Comment - The designer can write comments before committing the files to version control in this text box.
  • Commit and Push - this command is used to check-in modifications made to the working copy of the selected file(s) (in the Files region of the Storage Manager panel) into your VCS repository and push the project updates to the server. Modified files are distinguished by the status Modified.
  • Commit - use the drop-down to access the Commit button, which lets you check-in modifications made to the working copy of the selected file(s) (in the Files region of the Storage Manager panel) into your VCS repository. Modified files are distinguished by the status Modified.
If you find an issue, select the text/image and pressCtrl + Enterto send us your feedback.

软件的功能取决于您购买的Altium产品级别。您可以比较Altium Designer软件订阅的各个级别中包含的功能,以及通过Altium 365平台提供的应用程序所能实现的功能。

如果您在软件中找不到某个讨论过的功能,请联系Altium销售团队以获取更多信息。

Content