Update from Version Control
This document is no longer available beyond version 22. Information can now be found here: Out of date Revision for version 25
Summary
The Update from Version Control dialog allows collaborating designers to 'check out' and update working copies of their files from a shared repository, ensuring that their documents include any modifications made by other users working with the file.
Access
After a file that has been added to a shared repository is committed by one designer, a collaborating designer working on the same file will see the icon in their projects panel denoting that the file is out of date. Right-click on the file, or the project that contains it, and select Version Control » Update Whole Project to access this dialog.
Options/Controls
- Path - displays the file directory.
- Status - displays the current status of the file. If a file's status is displayed as Conflict, clicking OK to update the files will prompt a confirmation dialog. Click OK to update to the latest version in the repository or Cancel to exit and save changes to the version currently in the workspace.
Right-click Menu
- Select All - select all listed documents.
- Select None - select none of the listed documents.