WorkspaceManager_Dlg-ProjectReleaseOptionsFormProject Release Options_AD

您正在阅读的是 17.1. 版本。关于最新版本,请前往 WorkspaceManager_Dlg-ProjectReleaseOptionsForm((Project Release Options))_AD 阅读 22 版本

    

                                            

                                      The Release Options (online release (first image) and offline release (second image)) and Item Naming tabs of the Project Release Options dialog

Summary

The Project Release Options dialog is used to assign the applicable Outjobs and define how the target data items in the vault (whose revisions receive the generated data) are named when releasing a project.

Access

The dialog is accessed in the following ways:

  • Click Options in the Release view of the Project Releaser (Project » Project Releaser).
  • For an online release, from the Project Releaser, click on the Target Revision link for a data set to be released then choose Edit from the context menu.
This access option is available only when performing an online release (i.e., if you are currently connected to an Altium Vault). 

Options/Controls

Release Options Tab

  • Release Target - use the drop-down to select a different release target vault. To release locally in offline mode, select Folder from the drop-down. You can also use  on the right-hand side to open the Data Management - Vaults page of the Preferences dialog to define connections to vaults, if required.
  • Output Jobs
    • Source Data - enable the desired project source data. 
    • Fabrication Data - enable the desired data that will be used for board manufacturing (Gerber, ODB++, drilling information, etc.,). The exact content will be determined by the outjob.
    • Assembly Data - enable the desired data that represents assembly information (e.g., pick and place, assembly drawings, etc.,). The exact content will be determined by the outjob. Each variant is released to an individual item.
    • Custom Docs - enable the desired boxes to use backward compatibility and custom flows. Note that no references will be created, except to source data.

Item Naming Tab

  • Project Name - use to define the name for the project. By default, this will be filled with the actual name of the project. Enter a new name if desired.
  • Project Folder - use to define the top-level target folder in the vault into which the data will be released. Use  to open the Choose Folder dialog to search for and select a different folder. 
  • Item Type/Name - displays the default naming schemes for the various data items that can be generated as part of the release.

Additional Controls

  • Settings - click to open the Naming Template Settings dialog which allows you to change naming schemes if desired.
If you find an issue, select the text/image and pressCtrl + Enterto send us your feedback.

软件的功能取决于您购买的Altium产品级别。您可以比较Altium Designer软件订阅的各个级别中包含的功能,以及通过Altium 365平台提供的应用程序所能实现的功能。

如果您在软件中找不到某个讨论过的功能,请联系Altium销售团队以获取更多信息。